Engineering, Design & Consulting projects
Country | Client | Commodity | Project scope | Project status |
South Africa | South 32 – Mamatwan Mine Top-Cut Material Processing | Manganese |
The Pre-Feasibility Study (PFS) aimed at identifying the most practical and effective processing solution for the top-cut material. The PFS was required to investigate, select, and consolidate the preferred processing alternative to progress into Feasibility Study (FS), develop a Total Installed Cost (TIC) estimate and schedule, and establish an FS scope to minimise the risk of cost overruns and/or schedule delays during the execution of the Project |
February 2024 |
South Africa | Ivanplats – Platreef Shaft 2 | Platinum |
UMS are fulfilling the role of the owners’ team for the Platreef Shaft 2 construction project. This includes supporting and managing the following contractors:
|
In Progress |
South Africa | Sibanye – Burnstone Plant Refurbishment Project | Gold |
Refurbishment and recommissioning of the Burnstone Gold Plant, which included the following:
|
February 2024 |
South Africa | Pilanesberg Platinum Mines – Sedibelo Development Project | Platinum |
The design scope for UMS included:
|
September 2023 |
South Africa | Impala 1# | Platinum | Full shaft audit of aging shaft infrastructure with upgrade/optimisation recommendations. | 2021 |
South Africa | Evander/Pan Africa | Gold | Design of a compensating tower thereby enabling safe pillar extraction of remaining ore reserves in an aging mine. | 2019-2020 |
Botswana | Karowe diamond mine | Diamonds |
The Karowe Underground Project (KUP) scope of works entailed the design and engineering for the blind sinking of two vertical shafts. The main production shaft will have a finished internal diameter of 8.5m and be sunk to a depth of 765m below surface level. The ventilation shaft will have a finished diameter of 6m and be sunk to a depth of 755m. In addition to the shaft sinking activities, the scope of works includes the design and engineering for the equipping of the production shaft for permanent configuration and initial lateral development. |
|
Brazil | Ero Copper – Caraíba Pilar Mine | Copper |
The UMS scope included the design and construction of the new vertical mine shaft and underground rock handling arrangements The ERO Brasil Caraiba project. Design scope was for a shaft approximately 1,500m deep with a hoisting capacity of 2.2 million tonnes per annum of ore and waste from underground to surface. The shaft will also be capable of raising and lowering approximately 840 persons per day, to and from underground. The underground rock handling system included haul truck tips for ore and waste rock, storage silos for run-of-mine and crushed ore and waste rock, an underground primary crushing station, and conveyors to transfer the rock to the vertical shaft. |
To be completed in 2026 |
South Africa | Sibanye Stillwater Ikamva Kloof mine | Design of level declines. | 2022 | |
South Africa | Vanadium Resources | Vanadium | Pre-feasibility and definitive feasibility study. | 2021- 2022 |
South Africa | New Denmark – Seriti | Coal | Design of new conveyors, man cages and platforms. | 2020- 2021 |
Zimbabwe | Zimplats | Platinum | Implementation of a debottlenecking project to sustainably increase throughput to the downstream grinding circuit. UMS completed the detailed engineering, oversight of fabrication and construction and assistance with commissioning of the designed solution. | 2020 |
South Africa | Sepflour Nokeng | Detail review of the scoping study proposal. | 2020 | |
Senegal | Afrigold | Gold | Bankable feasibility study. | 2018 |
South Africa | Sasol – Brandspruit Colliery Impumelelo shaft | Coal | Design of the shaft complex. | 2013-2014 |
South Africa | Sasol – Shandoni shaft | Coal | Detailed engineering design for permanent infrastructure for the man and material shaft including a 65-tonne man cage. | 2013-2014 |
South Africa |
Impala 17 shaft | Platinum | Sinking designs for the main, ventilation and refrigeration shafts. | 2008 |
ENGINEERING, DESIGN & CONSULTING PROJECTS
SINKING PROJECTS
(VERTICAL & DECLINE)
DEVELOPMENT AND MINING
PROJECTS
UNDERGROUND CONSTRUTCTION AND REFURBISHMENT PROJECTS
PROCESS PLANT
PROJECTS
Engineering, Design & Consulting projects
Country | Client | Commodity | Project scope | Project status |
South Africa | South 32 – Mamatwan Mine Top-Cut Material Processing | Manganese |
The Pre-Feasibility Study (PFS) aimed at identifying the most practical and effective processing solution for the top-cut material. The PFS was required to investigate, select, and consolidate the preferred processing alternative to progress into Feasibility Study (FS), develop a Total Installed Cost (TIC) estimate and schedule, and establish an FS scope to minimise the risk of cost overruns and/or schedule delays during the execution of the Project |
February 2024 |
South Africa | Ivanplats – Platreef Shaft 2 | Platinum |
UMS are fulfilling the role of the owners’ team for the Platreef Shaft 2 construction project. This includes supporting and managing the following contractors:
|
In Progress |
South Africa | Sibanye – Burnstone Plant Refurbishment Project | Gold |
Refurbishment and recommissioning of the Burnstone Gold Plant, which included the following:
|
February 2024 |
South Africa | Pilanesberg Platinum Mines – Sedibelo Development Project | Platinum |
The design scope for UMS included:
|
September 2023 |
South Africa | Impala 1# | Platinum | Full shaft audit of aging shaft infrastructure with upgrade/optimisation recommendations. | 2021 |
South Africa | Evander/Pan Africa | Gold | Design of a compensating tower thereby enabling safe pillar extraction of remaining ore reserves in an aging mine. | 2019-2020 |
Botswana | Karowe diamond mine | Diamonds |
The Karowe Underground Project (KUP) scope of works entailed the design and engineering for the blind sinking of two vertical shafts. The main production shaft will have a finished internal diameter of 8.5m and be sunk to a depth of 765m below surface level. The ventilation shaft will have a finished diameter of 6m and be sunk to a depth of 755m. In addition to the shaft sinking activities, the scope of works includes the design and engineering for the equipping of the production shaft for permanent configuration and initial lateral development. |
|
Brazil | Ero Copper – Caraíba Pilar Mine | Copper |
The UMS scope included the design and construction of the new vertical mine shaft and underground rock handling arrangements The ERO Brasil Caraiba project. Design scope was for a shaft approximately 1,500m deep with a hoisting capacity of 2.2 million tonnes per annum of ore and waste from underground to surface. The shaft will also be capable of raising and lowering approximately 840 persons per day, to and from underground. The underground rock handling system included haul truck tips for ore and waste rock, storage silos for run-of-mine and crushed ore and waste rock, an underground primary crushing station, and conveyors to transfer the rock to the vertical shaft. |
To be completed in 2026 |
South Africa | Sibanye Stillwater Ikamva Kloof mine | Design of level declines. | 2022 | |
South Africa | Vanadium Resources | Vanadium | Pre-feasibility and definitive feasibility study. | 2021- 2022 |
South Africa | New Denmark – Seriti | Coal | Design of new conveyors, man cages and platforms. | 2020- 2021 |
Zimbabwe | Zimplats | Platinum | Implementation of a debottlenecking project to sustainably increase throughput to the downstream grinding circuit. UMS completed the detailed engineering, oversight of fabrication and construction and assistance with commissioning of the designed solution. | 2020 |
South Africa | Sepflour Nokeng | Detail review of the scoping study proposal. | 2020 | |
Senegal | Afrigold | Gold | Bankable feasibility study. | 2018 |
South Africa | Sasol – Brandspruit Colliery Impumelelo shaft | Coal | Design of the shaft complex. | 2013-2014 |
South Africa | Sasol – Shandoni shaft | Coal | Detailed engineering design for permanent infrastructure for the man and material shaft including a 65-tonne man cage. | 2013-2014 |
South Africa |
Impala 17 shaft | Platinum | Sinking designs for the main, ventilation and refrigeration shafts. | 2008 |
ENGINEERING, DESIGN & CONSULTING PROJECTS
SINKING PROJECTS
(VERTICAL & DECLINE)
DEVELOPMENT AND MINING
PROJECTS
UNDERGROUND CONSTRUTCTION AND REFURBISHMENT PROJECTS
PROCESS PLANT
PROJECTS
Sinking projects (Vertical & Decline)
Country | Client | Commodity | Project scope | Project status |
Botswana | Lucara (Karowe Mine) | Diamonds | Transition from open pit mining to underground via a production shaft (770 m) and ventilation shaft (728 m),including raise bored material handling ore passes, level development of 1550 meters in total, level construction, production shaft equipping and permanent winder supply and installation. | Current –to be complete in 2025 |
Brazil | ERO (Caraíba Pilar Deepening Project Brazil) | Copper |
The Pilar Deepening Project is designed to access deeper reserves of the Pilar Mine, which has been operating for nearly 40 years, first as open pit mine and thereafter as an underground mine with ramp access. The project includes a vertical shaft 6.3m in diameter and 1500m deep, with permanent facilities to hoist rock (ore and waste) and raise/lower personnel to this underground level. The shaft is being sunk in a unique raise-bore and slash method with follow-on shaft sidewall support and concrete lining. This method will improve the rate of advance in shaft sinking, delivering the commissioned shaft in quicker time. The project is being executed by UMS through four packages of work; (i) design, engineering and procurement services for the new shaft, (ii) shaft pre-sink construction and change over, (iii) main sink construction, (iv) shaft equipping and commissioning. |
|
USA |
WiPP – (Waste Internment Pilot Project LLC) |
Hazardous waste |
Sink a shaft (693 m X 7.92 m diameter) plus lateral development of 1750 m. |
2019 – 2024 |
South Africa | Pilanesberg Platinum Mines (PPM) East block access project |
Platinum | Development of 3 declines to transition from open pit mining to underground. | Project started 2022 |
India | Vedanta / Hindustan Zinc Limited (HZL) – Rampura Acgucha Mine Three shaft project | Zinc | Sinking of 3 concrete lined shafts and equipping of the main shaft including station construction. Development of twin decline. Main shaft: 950 m X 7.5 m diameter. North vent shaft: 497 m X 7.5 m diameter. South vent shaft: 507 m X 7.5 m diameter. Trackless development. |
2010 – 2019 |
Democratic Republic of the Congo | Kibali Gold (Barrick) – Kibali Mine Single Shaft project | Gold | Main Shaft 760 m x 7.0 m diameter. Three phase scope of works: 1. Shaft sinking and early development 2. Shaft equipping, winder installation, rope up and commissioning 3. Shaft manning, underground construction, including electrical and mechanical installations. |
2012 -2018 |
South Africa | Bafokeng Rasimone Platinum Mine (Joint Venture) – Styldrift Merensky Phase 1 sinking and equipping | Platinum | Sinking of Main (760 m X 10.5 m diameter) and Services Shaft (730 m X 6.5 m diameter); lateral infrastructure development and associated underground construction works; equipping of Service Shaft and station; trackless development. | 2015 -2017 |
India | Teesta III – Pressure shafts | Hydro | Two pressure shafts of 750 m X 5.4 m diameter each. | 2012 |
South Africa | Afplats (Pty) Ltd, Leeuwkop Mine Complex | Platinum | Sinking of the Main Shaft ( 1000 m X 10.2m diameter). | 2007 – 2012 |
South Africa | Lonmin PLC – Karee 3 Shaft – Underground 2 sub-incline & trackless development | Platinum | Sinking of decline shaft (649 m) with further horizontal development, including infrastructure for declines – silos, settlers, conveyors, bulkheads On-reef development (± 165 000m³) and ore handling. | 2013 – 2019 |
South Africa | Hernic – Bokfontein Mine – Development of a twin decline system and stoping | Twin decline system (3.5 m X 6.0m diameter) and 120ktm stoping. | 2011 – 2013 | |
South Africa | Impala 17 Three Shaft Project | Platinum | Sinking of 3 shafts; Main (1932.8m X 10.0 m diameter); Vent (1764.2m X9.5 m diameter); and Fridge Shafts (1432m X 6.0 m diameter with the associated lateral development between the shafts. Installation of the ore-pass systems and civil works. Concrete lining with cast in items for permanent equipping. Trackless development. |
2010 – 2014 |
South Africa | Bafokeng Rasimone Platinum Mine – Styldrift Shaft sinking JV | Platinum | Sinking and equipping of a Main and Services Shafts, including shaft and station equipping, lateral infrastructure development and associated underground construction works (bulkheads and conveyor belts installation). Trackless development. Main Shaft: 760m X 10.5m diameter. Service Shaft: 730m X 6.5m diameter. |
2015 – 2017 |
South Africa | Impala 16 Twin Shaft Project | Platinum | Sinking of the Main shaft (1665 m X 10.0 m diameter) and Vent shaft (1390 m X 6.8 m diameter); lateral development between the shafts; installation of the ore-pass systems and civil works; installation of the station infrastructure including pumps, settling system and conveyor belts; permanent equipping and commissioning of the Main Shaft system. | 2006 -2014 |
Mali | Somilo S.A, Yalea Underground Mine – Mali | Gold | Single decline system (876 m) plus development and ancillary reef and waste development (380 000 m³ / 4.5m H x 4.5m W). Long hole Caving Mining. |
2006 – 2010 |
South Africa | Phakisa Phase 3 | Gold | Sinking of a main shaft (2471m X 7.1m diameter) including equipping of shaft infrastructure. | 2006 – 2008 |
Switzerland | Gotthard Tunnel Sedrun Shaft – (Joint Venture) | Transport | Sinking of a ventilation shaft of 850 m X 8.5 m diameter and TMM development | 2002 |
South Africa | Impala 14A Vent – Sinking of Ventilation Shaft | Platinum | 1080 m X 5.1 m diameter. | 2002 |
South Africa | Vaal Reefs No. 11 Main Shaft | Gold | 2.460 . X 10.75 m diameter. | 2000 |
Brazil | Morro Velho – Raposos No. 5 Sub Shaft | Sinking of a sub-shaft (678 m X 6.5m diameter). | 1992 | |
Laos | Houay Ho Hydropower station – headrace shaft | Hydro | Sinking of a 714 m X 4.0 m diameter shaft. | 1996 |
Indonesia | Pt. Aneka Tambang Mine service shaft | Sinking of a 320m X 6.2 m diameter shaft. | 1997 | |
Chile | El Bronce – Decline development | Decline system (2300 m / 2.5m H x 2.7m W). | 1995 |
ENGINEERING, DESIGN & CONSULTING PROJECTS
SINKING PROJECTS
(VERTICAL & DECLINE)
DEVELOPMENT AND MINING
PROJECTS
UNDERGROUND CONSTRUTCTION AND REFURBISHMENT PROJECTS
PROCESS PLANT
PROJECTS
Development and mining projects
Country | Client | Commodity | Project scope | Project status |
South Africa | Pilansberg Platinum Mines – Sedibelo Project | Platinum |
15km of Trackless Development. |
2022-2023 |
South Africa | Lonmin PLC Karee 3 shaft | Platinum | Trackless horizontal development and installation of various services (+/- 226,000m3). | 2006 -2019 |
South Africa | Hernic – Bokfontein mine | Platinum | 120 ktm of stoping plus trackless development. | 2011 – 2013 |
South Africa | Impala 16 twin shaft project | Platinum | On completion of the shaft sinking and equipping phase of our project we continued with trackless lateral development to the reef. | 2006-2014 |
South Africa | Anglo Platinum – Unki mine | Platinum | Bord and Pillar production mining of +/- 120 kilotons per month. | 2008 |
South Africa | Everest Aquarius mine | Platinum | Trackless mining of +/- 250,000 kilotons per month including triple decline system with end sizes 4 m (H) X 4.5 m(W). | 2006 – 2008 |
South Africa | Everest Aquarius mine | Platinum | Conventional mining of +/- 40,000 kilotons per month. | 2007 – 2008 |
South Africa | IMR Buffelsfontein Chrome Mine Lesedi shaft | Chrome | Trackless mining of 70,000 kilotons per month including decline development, stoping and construction. | 2007-2008 |
ENGINEERING, DESIGN & CONSULTING PROJECTS
SINKING PROJECTS
(VERTICAL & DECLINE)
DEVELOPMENT AND MINING
PROJECTS
UNDERGROUND CONSTRUTCTION AND REFURBISHMENT PROJECTS
PROCESS PLANT
PROJECTS
Underground construction and refurbishment projects
Country | Client | Commodity | Project scope | Project status |
South Africa | Harmony Kusasalethu shaft refurbishment project | Gold | Re-equipping of sub vent shaft. | 2022-2023 |
South Africa | Impala 20 Shaft refurbishment project | Platinum | Refurbishment of loading bin, settler, shaft barrel, silos, and headgear bin. Grouting of the dam wall. |
2022-2023 |
South Africa | Harmony Target Mine shaft refurbishment | Gold | Removal of old brattice wall. | 2021- 2022 |
South Africa | RBM Styldrift mine bulkhead installations | Platinum | Underground mining construction and replacement of bulkheads. | 2019- 2021 |
South Africa | South 32 Wessels mine – shaft rehabilitation | Manganese | Extensive shaft rehabilitation and repair work. | Started 2019 and ongoing |
South Africa | Pan Africa Evander shaft refurbishment | Gold | Design and installation of a compensating tower in an old shaft at Pan Africa’s Evander Mine, enabling the mine to undertake safe pillar extraction to extract remaining ore reserves. | 2019-2020 |
South Africa | Orion Minerals Copperton mine | Copper | Dewatering and initial refurbishment of the mine after care and maintenance. | 2017- 2019 |
South Africa | Evander 7 shaft | Gold | Shaft repair and steelwork replacement to extend life of mine. | 2017-2018 |
South Africa | Anglo Platinum – Turffontein Mine | Platinum | Shaft rehabilitation and shaft steelwork replacement. | 2008 |
South Africa | Moab Khutsong | Gold | Excavation of underground silos and ore passes. | 2007- 2008 |
South Africa | Palabora | Copper | Excavation of #3 and #4 crusher chambers. | 2002 |
Swaziland | Maguga Dam | Hydro | Intake, diversion and outlet tunnels of 8m X 9m diameter and 485 meter in length. | 1999 |
ENGINEERING, DESIGN & CONSULTING PROJECTS
SINKING PROJECTS
(VERTICAL & DECLINE)
DEVELOPMENT AND MINING
PROJECTS
UNDERGROUND CONSTRUTCTION AND REFURBISHMENT PROJECTS
PROCESS PLANT
PROJECTS
Process plant projects
Country | Client | Commodity | Project scope | Project status |
South Africa | Burnstone – metallurgical plant | Gold ore |
|
2022-2023 |
Zimbabwe | Zimplats – Zimplats Selous Metallurgical Complex (SMC) | Platinum |
|
2019-2020 |
Zimbabwe | Zimplats HPGR project | Platinum |
Design and install a solution to increase the current SMC pebble crushing capacity and efficiency by means of increasing cone crusher feed bin capacity; including installation of standby cone crusher unit as well as the installation of a High Pressure Grinding Roll (HPGR) unit. These modifications increased the pebble crushing circuit throughput to 120t/hr. |
2019 |
Mozambique | Manica – Mutupa Mining and Processing (MMP) | Gold |
|
2020 – January 2023 when plant was commissioned |
Brazil | Ero Copper Corp – Tucumã Project | Copper |
|
2022 – 2023 Plant owner is currently undertaking construction directly |
South Africa | Kumba – Kolomela crushing operation | Iron ore |
|
2016 -2019 |
South Africa | Sibanye Stillwater – Kloof Operations SRD Crushing Plant | Gold |
We were requested to install and operate and transfer a mobile crushing and screening plant for the client. The Crushing and Screening Plant required to be designed based on the following key parameters:
The plant was sold in 2019. |
2018 -2019 |